articles

Photo Article: pointing and main stair entrance complete at the Greek Hovel

Tom Winnifrith Saturday 7 July 2018

 

Share this

By noon London time on Tuesday I shall be up at the Greek Hovel to survey progress. I gather that the polished concrete floors, a very smooth white surface, in the rat room and the new wing have been laid and expect to post photos before I go. Next week the roof really does start to go up, something the Mrs and daughter Olaf - who arrive in 40 days view as important. Pedants.

However, as you can see below, Gregori the snake killer and his team of Albanians have been hard at work. All the pointing is now done and as a bonus the staircase leading up to the main door has now been completely rebuilt, tearing away any old concrete and replacing it with solid stone. The countdown is underway, three days to Greece!

, , , , , ,

About Tom Winnifrith
Bio
Tom Winnifrith is the editor of TomWinnifrith.com. When he is not harvesting olives in Greece, he is (planning to) raise goats in Wales.
Twitter
@TomWinnifrith
Email
[email protected]
Read next

Tom Winnifrith Bearcast: the battle of the devout Christian giants: Matt Lofgran vs Flip Flop Ben Turney. Praise be the Lord

All we need now is for Julie “Lingerie on expenses” Meyer to enter the bust up at Nostra Terra Oil & Gas (NTOG) and the holy row would be complete. This will be entertaining if, I suspect, utterly pointless. I also comment on Versarien (VRS) correcting a BB loon – and flag up that I have a major AIM expose of a high profile, shortable, stock going live tomorrow morning. I explain why it is so interesting. Now I am off to do a Woodlarks training walk. So far we have £6600 raised or pledged - don’t be mean donate today HERE

On ShareProphets
Tuesday 28 January 2020
TomWinnifrith.com Copyright © . All rights reserved.
Created by Everywhen